1. Material and component cost
Steel tube gauge, post diameter, plywood grade, foam density, PVC thickness, netting specification and hardware finish. Two quotes can differ 30% on materials alone while showing the same drawing.
Factory-Direct Pricing · Source Verification · Landed Cost
Factory-direct pricing only saves money when you know what sits inside the quoted number. This page breaks down how a source factory builds its price, how to prove you are buying from the maker rather than a reseller, and which shipping and customs terms decide your final landed cost.

Design Framework
A single square-metre price hides the parts of the cost that actually vary between suppliers. Ask for the structure below and two quotes become comparable.
Steel tube gauge, post diameter, plywood grade, foam density, PVC thickness, netting specification and hardware finish. Two quotes can differ 30% on materials alone while showing the same drawing.
Cutting, welding, powder coating, sewing and assembly labour, plus any mould or custom theming tooling. Custom shapes carry one-time tooling that should appear as a separate line, not be hidden in unit price.
In-process inspection, pre-shipment checks and the test reports you intend to rely on. Certification testing costs money; a price that excludes it is not cheaper, it is incomplete.
Volume drives ocean cost more than weight. Confirm cubic metres, container count, packing method, port of loading, incoterm, destination charges, duty responsibility and who acts as importer of record.
Equipment Mix
Each item below should carry a quantity, specification and price so that you can remove or adjust scope without renegotiating the whole project.
Posts, beams, decks, stairs, guard panels and fixings, with tube size, wall thickness and coating stated per item.
Foam density, cover material, thickness and fire-performance data for wrapped posts, padded decks and soft shapes.
Slide type, material, entry height, exit zone and any rotating or interactive components listed individually.
Surfacing type, thickness and the critical-fall-height basis it is supplied against, quoted separately from equipment.
Total cubic metres, container loading plan, crate or carton method, port and incoterm, with destination charges identified.
Assembly drawings, parts list, on-site supervision option, spare-parts pack, warranty terms and the test-report set included.



Prices move with scope and responsibility, so compare what each channel actually carries.
| Channel | Typical price position | Who owns specification | Main risk to manage |
|---|---|---|---|
| Source factory | Lowest equipment cost | Buyer plus factory engineering | Buyer coordinates freight and install |
| Trading company | Equipment plus margin | Agent interprets the brief | Actual maker may be unknown |
| Local dealer | Highest, service included | Dealer owns full scope | Limited pricing transparency |
| Marketplace listing | Unit price only | Nobody owns the full scope | Specification and testing unclear |
Planning guidance only. Confirm duties, taxes and importer responsibilities for your own country before comparing landed costs.
Best-Fit Buyers
Factory-direct purchasing rewards buyers who can review a specification and manage a delivery window; it is less suitable when a project needs a local single point of accountability for everything.
Repeat volume, standardised modules and reorderable parts make a direct factory relationship far cheaper over several openings.
Teams already handling permits, flooring and installation can take equipment supply direct and keep site coordination in house.
Need OEM pricing, consistent finishes, spare-part availability and documentation they can present to their own customers.
Workable when the factory supplies drawings, installation supervision and a clear parts list; risky if nobody owns on-site assembly.
FAQ
Equipment cost is usually lower, but freight, customs, installation and site work move to your side of the table. Compare landed and installed cost, not the quoted equipment figure alone.
Ask for a business licence showing manufacturing scope, production-line photos or a live video walk-through, test reports issued in the factory's own name, and the address on the packing list matching the production site.
Request FOB for a comparable baseline, then ask for CIF or DAP as an option. Comparing an EXW quote with a CIF quote without adjusting for freight makes the wrong supplier look cheaper.
Volume, not weight. Ask for total cubic metres and the container loading plan; smart nesting of slides and soft modules can remove a whole container from the shipment.
Yes. Many buyers start with one zone or one container to test workmanship, documentation and responsiveness, then scale with a standardised module list.
Packing list matched to crate labels, assembly drawings, parts schedule, applicable test reports, warranty terms and a spare-parts inventory.
Safety and compliance claims on this page reference the following primary standards and regulatory publications.
Source data as of September 2026 · 数据截至 September 2026
Fill out the form below and our team will send you a custom design proposal and competitive quote within 24 hours.
Get an instant response from our team via WhatsApp. We're online 12+ hours daily.
🎯 We respond to all inquiries within 24 hours with a free 3D design concept and detailed quote — no commitment required.